Critical Path – Project Management Unisex Sweatshirt

from $35.00
Because not everything deserves your attention — only what matters most. This sweatshirt is for the project leader who knows the truth:
the Critical Path is sacred. It is not to be blocked. It is not to be delayed.
And it is absolutely not to be ignored.

When the noise gets loud and the distractions multiply, you’ll still be locked in, laser-focused, and right on time.

Because fabulous doesn’t happen by accident.
It happens by design.

• 50% cotton, 50% polyester
• Pre-shrunk
• Classic fit
• 1x1 athletic rib knit collar with spandex
• Double-needle stitched collar, shoulders, armholes, cuffs, and hem

Disclaimers:
• Subtle orange hue shifts with lighting in the Orange color variant.

This product is made especially for you as soon as you place an order, which is why it takes us a bit longer to deliver it to you. Making products on demand instead of in bulk helps reduce overproduction, so thank you for making thoughtful purchasing decisions!
Color:
Size:
Because not everything deserves your attention — only what matters most. This sweatshirt is for the project leader who knows the truth:
the Critical Path is sacred. It is not to be blocked. It is not to be delayed.
And it is absolutely not to be ignored.

When the noise gets loud and the distractions multiply, you’ll still be locked in, laser-focused, and right on time.

Because fabulous doesn’t happen by accident.
It happens by design.

• 50% cotton, 50% polyester
• Pre-shrunk
• Classic fit
• 1x1 athletic rib knit collar with spandex
• Double-needle stitched collar, shoulders, armholes, cuffs, and hem

Disclaimers:
• Subtle orange hue shifts with lighting in the Orange color variant.

This product is made especially for you as soon as you place an order, which is why it takes us a bit longer to deliver it to you. Making products on demand instead of in bulk helps reduce overproduction, so thank you for making thoughtful purchasing decisions!