Critical Path Project Management Unisex t-shirt

from $16.50
Because not everything deserves your attention — only what matters most.

This t-shirt is for the project leader who knows the truth:
The Critical Path is sacred.
It is not to be blocked.
It is not to be delayed.
And it is absolutely not to be ignored.

• 100% combed and ring-spun cotton (Heather colors contain polyester)
• Fabric weight: 4.2 oz/yd² (142 g/m²)
• Pre-shrunk fabric
Color:
Size:
Because not everything deserves your attention — only what matters most.

This t-shirt is for the project leader who knows the truth:
The Critical Path is sacred.
It is not to be blocked.
It is not to be delayed.
And it is absolutely not to be ignored.

• 100% combed and ring-spun cotton (Heather colors contain polyester)
• Fabric weight: 4.2 oz/yd² (142 g/m²)
• Pre-shrunk fabric